Quantcast
Channel: MSA Storage topics
Viewing all articles
Browse latest Browse all 2301

Best way to move customer from smaller pools to larger?

$
0
0

Hi

 Just wanting to confirm my logic for the following plan for an MSA2050

Customer has 2x RAID5 3+1 disk groups (one pool a, the other pool b). 

Customer wants to fully populate array with same 600gb sas drives but end up with

2x RAID 5 9+1 disk groups in each pool plus 2 spares per pool.

Currently bays 1-8 are in use - no spares.

My plan

1. Create new DG in pool in slots 10-20 RAID5 9+1 in pool b

2. Remove existing 3+1 RAID5 DG in pool B forcing data migration to new DG in pool B

3. Using ESXi storage vmotion move data from pool A into new larger pool B.

4. remove old DG in pool A and recreate as 9+1 RAID 5 in slots 1-10 (using the 8 original drives and 2 new ones).

5. migrate data back into pool A from pool b using storage vmotion.

5. add two spares per pool in slots 21-24.

This means hopefully no downtime for the customer but will mean some performance impact.

It's either that or delete both DG's and start over  re-creating the DGs with restoration from backup.

Hopefully I've not missed anything.

Any feedback appreciated. I've not touched an MSA for a while.

thanks.

 


Viewing all articles
Browse latest Browse all 2301

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>